Dispatching crews: scheduling unscheduled and multi-day jobs on one board

How a home-services office keeps jobs with no date from being forgotten, books multi-day work without clashes, and dispatches named crews from one board.

The BittaFlow team

2 min read

The short answer

Keep every job that has no date yet in a visible list beside the schedule, not in a notebook. Book multi-day work as one job that appears on each day it runs, and assign crews rather than individuals so every member is checked for clashes. Then schedule by dragging from the list onto a technician’s hour.

On this page
  1. Why do unscheduled jobs get lost?
  2. How should you book a job that runs over several days?
  3. Should you dispatch people or crews?
  4. What should the dispatch board show?
  5. How do technicians record their time?
  6. How does BittaFlow handle crews and multi-day jobs?
  7. Questions people ask next

Why do unscheduled jobs get lost?

Because they have nowhere to live. An approved quote waiting for parts, a customer who said “sometime next month”, an inspection that needs a follow-up — none of them has a date, so none of them is on the calendar, and the calendar is what the office looks at.

The fix is a waiting list that sits beside the schedule and is seen every time someone schedules anything.

How should you book a job that runs over several days?

As one job, not three. Three separate bookings drift apart: one is moved, the others are not, and the crew turns up on day two to a house that thinks they are coming on Thursday. One job that shows on each day it runs keeps the customer, the crew and the invoice on the same record.

Should you dispatch people or crews?

If the same two or three people go out together, dispatch the crew. Name it, give it a lead, and put the crew on the job. The schedule should then check every member, on every day — a crew is only free if all of its people are.

What should the dispatch board show?

At a glance, for the day:

  • One lane per technician, with travel between jobs taken into account
  • Jobs still waiting for a date, beside the board
  • Multi-day jobs on each of their days
  • A filter for one crew’s day

How do technicians record their time?

From the job, with labels: travel, on site, break. Time recorded against the job tells you what the job cost; a clock-in for the day only tells you someone was working.

How does BittaFlow handle crews and multi-day jobs?

BittaFlow’s dispatch board shows one lane per technician. Jobs with no date wait in their own list beside the board; drop one onto an hour and it is scheduled. Drag a job to another technician or time and the technician is texted.

Crews are made on the staff tab with a name, color, lead and members, and put on a job. Clashes are checked for every member on every day, and multi-day jobs show on every day they run. From the job page, technicians log travel, on-site time and breaks, and can start crew time for everyone; it all lands on the Timesheets tab of Job reports.

A technician opens on their own day, and their inbox shows only the conversations assigned to them.

  • Part of every CRM plan for home-services businesses
  • Clash checking, not automatic capacity planning — who goes where is still your call

Questions people ask next

Can I schedule a job that has no date yet?

Yes. In BittaFlow, jobs without a date sit in a list beside the dispatch board until you drop them on a technician’s hour.

Does it stop me double-booking a crew?

Yes. Every member of a crew is checked for clashes on every day the job runs.

Does it plan crew capacity automatically?

No. It prevents clashes and shows each crew’s day; deciding who goes where stays with the office.